Kitchen Final Walk-Through

It’s not quite done, so the “after” pictures are named “SemiAfter”, but the main contractor is doing a final walk through, today (Wed, 3 Aug). Here’s what they’ve done:

Standing in the doorway looking east to the back door
Standing in about the same place looking about the same direction
Standing at the door in the previous picture looking west (the front door is behind the wall)
Standing in about the same place looking about the same direction
The southeast corner (standing in front of the door)
The southeast corner (standing in front of the sink) w/disassembled range hood

Clearly not finished, but everything works!

Leave a comment